Variable project parameters list |
Changing the value of variable project parameters |
Electricity Sales Level |
А) Reduction in the volume of electricity sold by 5%.B) Growth in the volume of electricity sold by 5%. |
Conditionally fixed costs |
A) Decrease in fixed costs by 2%.B) Growth of fixed costs by 2%. |
Investment costs |
A) Lower investment costs by 10%.B) Growth of investment costs by 10 %. |
Inspection costs(risk of control) |
A) Increase in inspection costs by 10%.B) Increase in inspection costs by 20%. |
Exclusion of investment costs from total RGP (risk of low profitability) |
A) Decrease in total NGP on 10 %.B) Decrease in total NGP by 20%. |