European Proceedings Logo

Effective Option Of Sugar Beet Harvesting Technology

Table 5: Values of the desirability function for the compared

Brand of the i-th beet harvester The value of the dj function by the j-th indicators
d1 operating costs d2root damage d3 labor costs d4 metal consumption Average
1 HOLMER 0.621 0.74 0.75 0.61 0.68
2 SF-10 0.671 0.628 0.74 0.71 0.69
3 WKM-9000 0.693 0.8 0.76 0.61 0.72
4 Stoll 0.2 0.324 0.432 0.2 0.29
5 Moro-Lektra 0.796 0.2 0.8 0.8 0.65
6 WIC complex 0.8 0.48 0.2 0.7 0.55
< Back to article