European Proceedings Logo

Reengineering Of Management System Of Oil Production Enterprise Capital Repairs

Table 5: Initial data for solving the problem of finding the minimum amount of economic effect on the project

Events Costs for the implementation of measures, thousand rubles (Xi) Planned annual economic effect, thousand rubles (Ai)
Safety (exclude cases of using containers with violations of industrial safety requirements) Х1 0
Quality (reduce the proportion of rejects due to poor-quality wellbore flushing by 44%) Х2 А2
Terms (reduce the average duration of 1 repair by 2.5%) Х3 А3
Costs (reduce transport costs by 66%) Х4 А4
Culture (reduce the number of violations of production culture by 43%) Х5 0
TOTAL, thousand rubles 5 000 А
< Back to article