Reengineering Of Management System Of Oil Production Enterprise Capital Repairs

Table 3: Initial data for solving the problem of finding the optimal size of one-time costs in the project

Events Costs for the implementation of measures, thousand rubles (Xi) Planned annual economic effect, thousand rubles (Ai)
Safety (exclude cases of using containers with violations of industrial safety requirements) Х1 0
Quality (reduce the proportion of rejects due to poor-quality wellbore flushing by 44%) Х2 12 000
Terms (reduce the average duration of 1 repair by 2.5%) Х3 40 000
Costs (reduce transport costs by 66%) Х4 44 000
Culture (reduce the number of violations of production culture by 43%) Х5 0
TOTAL, thousand rubles Х 96 000