European Proceedings Logo

Hydroelectrical Power Plant (Hpp) –Aspects Regarding The Operating And Maintenance Technologies

Table 1:

Characteristics
Constructive Technological
Putting in operation – 1987 Installed power - 5,4 MW
Energetic source – Târgului river Maximum energy produced - 14,4 GWh
Turbine – vertical, Francis type Maxim installed flow - 10,3m3/s
Generator – Three-phase synchronous vertical hydro generator Rated speed – 600 rot/min
Maximum netfall- 68m Nominal load output - 96,1%