No. |
Construction cost |
Mean Score |
Frequency |
Rank |
Construction Site Cost |
|
1 |
Land Acquisition |
3.74 |
High |
9 |
2 |
Title Insurance |
3.58 |
High |
18 |
3 |
Site Demolition |
3.52 |
High |
29 |
4 |
Transfer Taxes |
3.52 |
High |
30 |
5 |
Commission & Fees |
3.42 |
Medium |
34 |
6 |
Feasibility/Survey |
3.42 |
Medium |
35 |
Construction Hard Cost – Building Materials |
|
1 |
Timber |
4.10 |
High |
1 |
2 |
Aggregates |
4.03 |
High |
2 |
3 |
Bricks |
4.03 |
High |
3 |
4 |
Cement |
4.00 |
High |
4 |
5 |
Roofing Materials |
4.00 |
High |
5 |
6 |
Glass |
3.97 |
High |
6 |
7 |
Ready Mix Concrete |
3.97 |
High |
7 |
8 |
Iron/Steel Reinforcement/ Bar |
3.90 |
High |
8 |
Construction Hard Cost – Labour |
|
1 |
Bricklayer |
3.52 |
High |
24 |
2 |
Tiller |
3.52 |
High |
31 |
3 |
Roofer |
3.52 |
High |
28 |
4 |
Plumber |
3.52 |
High |
27 |
5 |
Painter |
3.52 |
High |
26 |
6 |
Concretor |
3.48 |
Medium |
32 |
7 |
Steel Barbender |
3.45 |
Medium |
33 |
8 |
Structural Steel Worker |
3.42 |
Medium |
36 |
9 |
Plasterer |
3.39 |
Medium |
39 |
10 |
Carpenter (Formwork) |
3.39 |
Medium |
37 |
11 |
General Labour |
3.39 |
Medium |
38 |
12 |
Carpenter (Joinery) |
3.35 |
Medium |
40 |
Construction Hard Cost – Equipment and Machinery |
|
1 |
Excavator / Backhoe |
3.65 |
High |
10 |
2 |
Marble / Granite Polisher |
3.61 |
High |
14 |
3 |
Concrete Mixer |
3.61 |
High |
12 |
4 |
Concrete Vibrator c/w Poker |
3.58 |
High |
15 |
5 |
Mobile Crane |
3.58 |
High |
17 |
6 |
Bar Cutter / Bender |
3.55 |
High |
20 |
7 |
Power Trowel |
3.55 |
High |
23 |
Construction Soft Cost |
|
1 |
Marketing Fees |
3.65 |
High |
11 |
2 |
Insurance Fees |
3.61 |
High |
13 |
3 |
Legal Fees |
3.58 |
High |
16 |
4 |
Others |
3.55 |
High |
22 |
5 |
Engineering Fees |
3.55 |
High |
21 |
6 |
Architectural Fees |
3.55 |
High |
19 |
7 |
Loan / Interim Fees |
3.52 |
High |
25 |