Improvising Industrialised Building System Through the Adoption of Building Information Modeling
Table 2: Level of awareness towards BIM at different stage
| Stages | RII | Rank |
| BIM awareness at feasibility stage | 0.425 | 1 |
| BIM awareness at design stage | 0.328 | 3 |
| BIM awareness at construction stage | 0.409 | 2 |
| BIM awareness at in-use and maintenance stage | 0.345 | 4 |
