European Proceedings Logo

Economic Efficiency Of Care Cutting Equipment Modernization

Table 4: Technical and economic indicators

Indicator name Indicator value
Basic variant Project variant
Type of work Forest thinning Forest thinning
Wood species Larch Larch
Average volume tree trunk, m3 0.30-0.36 0.30-0.36
Equipment Chainsaw MP-5 Ural Projected chopping without felling wood based on Bobcat T770
Equipment cost, thousand rubles. 9.6 7000
Type of work Felling Cutting wood with simultaneous chopping
Branching
Bucking
Chopping and spreading felling residues
Workout for 1 man-day, m3 5.1 84.5
Annual scope of work, m3 8873 8873
Labor costs for 1 m3, man-h 2.259 0.095
Cost price 1 m3, rub. 800.63 249.13
- wage 475.06 28.91
- insurance premiums 28.98 1.76
- equipment maintenance and operation costs 296.59 218.46
Conventional annual cost savings, thousand rubles 4893
Net profit growth, thousand rubles 3792
Payback period of capital investments, years 1.8