|
Building |
Premise |
Minimum |
Weighted mean by the size |
Minimum |
Weighted mean by the size |
Mean specific indicator of the cadastral value by cadastral units, rubles per one square meter |
1 792.7 |
12 575.3 |
6 283.4 |
24 961.6 |
Expected IPT rate |
Calculated IPT rate depending on the type of a taxation object (rubles per one square meter) |
0.2 % |
3.6 |
25.2 |
12.6 |
49.9 |
0.4 % |
7.2 |
50.3 |
25.1 |
99.8 |
0.6 % |
10.8 |
75.5 |
37.7 |
149.8 |
0.8 % |
14.3 |
100.6 |
50.3 |
199.7 |
1.0 % |
17.9 |
125.8 |
62.8 |
249.6 |
1.2 % |
21.5 |
150.9 |
75.4 |
299.5 |
1.4 % |
25.1 |
176.1 |
88.0 |
349.5 |
1.6 % |
28.7 |
201.2 |
100.5 |
399.4 |
1.8 % |
32.3 |
226.4 |
113.1 |
449.3 |
2.0 % |
35.9 |
251.5 |
125.7 |
499.2 |