European Proceedings Logo

Analysis Of Costs For Land Development In Price Of Construction Products

Table 1:

The scope of work and expenses for land development
Land plot registration Land use planning and management
1. Cost of allotment of land plot, issuance of architectural and planning assignment and allocation of building limit lines 1. Costs related to compensation for structures listed for demolition, for planting, sowing, plowing and other gardening works, performed on the alienated territory, to compensation of losses and lost profits, for the transfer of buildings and structures (or construction of new buildings and facilities instead of demolished), compensation of losses caused by performing water-management works, termination or change of conditions of water use.
2. Costs of staking and fixing the main axes of buildings and structures, and their stabilization
3. The cost of demining the construction site in combat areas
4. Land payment for the seizure (redemption) of the land plot for construction, as well as payment of land tax (rent) during the construction period 2. Cost of reimbursement of production losses in case of land withdrawal
5. Costs related to receiving the initial permitting documentation (IRD) by the customer and the project organization 3. Costs related to unfavourable hydrogeological conditions of the construction site and the necessity of loop road construction for urban transport
< Back to article