European Proceedings Logo

Periodization: Finalization of the Training Units and of the Load’s Entity

Table 3:

Loads Criteria of load’s size Goal achieved
Scant First phase of the stable working capacity period (15-20% of the work volume that is achieved before obvious fatigue occurs) Maintaining the level of preparation achieved, acceleration of the recovery processes after the loads
Average Second phase of the stable working capacity period (40-60% of the work volume that is achieved before obvious fatigue occurs). Maintaining the level of preparation achieved, reaching particular objectives of the preparation
Considerable Phase of compensated fatigue (60-70% of the work volume achieved before obvious fatigue occurs). Stabilization and, subsequently, increased preparation
Elevated Obvious fatigue Further increment of preparation
< Back to article