Description Number, pcs General time, s Average time per 1 pc % from general time
Takes the body 10 48 4,8 3,09
Unpacks the body 10 61 6,1 3,90
Throw out the paper 10 4 0,4 0,26
Visual monitoring 10 32 3,2 2,09
Takes a socket spanner 5 1 0,3 0,09
Installation of a sealing bolt 10 110 11,0 7,05
Puts a socket spanner 5 1 0,3 0,09
Wire installation 10 121 12,1 7,78
Fixing of a wire by means of a sealing bolt 10 157 15,7 10,0
Installation LP 10 4 0,4 0,23
Takes a fastener driving machine 40 306 7,6 19,67
Mounting LP 10 4 0,4 0,26
Puts a fastener driving machine 100 673 6,7 43,31
Delivery to the next stage 10 33 3,3 2,10