European Proceedings Logo

Pros And Cons Of Incomplete Contract In Private Finance Initiative (Pfi) Project

Table 1: Administration of MD method

Description
Panellist criteria Knowledge wise – have minimum a Degree in the field relevant to PFI projects, e.g. engineer, architect, others. Skills – capable in expressing objectivity in reference to their: knowledge and experience in PFI projects e.g. planning, implementation, supervision, etc.; or the evidence of expertise e.g. past studies, publications, and positions. Work experience in PFI projects in Malaysia.
Sample size Expert identification was carried out through literature searches, web-search and pilot study.Snowball technique.23 experts were identified and invited to be the panelists. 18 participated in Round 1 (78.2% rate of response), 13 participated in Round 2 (72.2% rate of response).
< Back to article