European Proceedings Logo

A Matrix Analysis On Building Maintenance Budget Determination In Malaysia

Table 4: A Matrix for Generating Summary of Documentation Analysis: Calculation and Comparison of the Basic Rate of Building Maintenance between Case Study

Basic price of BM cost Northern Zone Southern Zone Eastern Zone
Cost (RM) per sq. 105.27 209.09 130.15
Average of building age 11.5 13 15.8
< Back to article