European Proceedings Logo

Strategy Formulation and Sustainability Performance of Bumiputera Construction Companies: A Conceptual Paper

Table 2: Contractor’s classification according toitotal paid-up capital

Registration Grade (CIDB) Tendering Capacity (RM) Paid-up Capital (RM) Contractors’ categoryi (size)
G1 <200,000.00 5,000.00 Small
G2 <500,000.00 25,000.00 Small
G3 <1,000,000.00 50,000.00 Small
G4 <3,000,000.00 150,000.00 Medium
G5 <5,000,000.00 250,000.00 Medium
G6 <10,000,000.00 500,000.00 Large
G7 No Limit 750,000.00 Large
< Back to article