European Proceedings Logo

Testing of the Proposed Road Upgrade at the Predmostnaya Ring in Krasnoyarsk

Table 1: Results of models

Model Without changes After optimizing other traffic lights, without taking into account the traffic light on the ring With a traffic light on the ring after optimization Optimization during traffic light operation 120/40 sec Results after modernization, without optimization Results after modernization and after optimization Results after modernization of the 3rd tier and after optimization
Number of cars passed 2398 (traffic jam) 4098 4815 4040 5300 5424 6139
Improvements relative to the real value - 1.7 2 1.68 2.21 2.26 2.56
Ratio (%) - +170% +200% +168% +221% +226% +256%
< Back to article